Tenaga Ahli Estimator – Kalkulator Proyek

This tool estimates the number of experts you need for your project based on your input criteria.

Tenaga Ahli Cost Estimator







How to Use:

To use the Tenaga Ahli Cost Estimator, please enter the required values into the respective fields:

  • Number of Experts: The total number of experts you are hiring.
  • Number of Days: The total number of days for the project.
  • Hours per Day: The number of hours each expert will work per day.
  • Hourly Rate per Expert (USD): The hourly payment rate for each expert.
  • Transport Cost per Expert (USD): The transport cost for each expert.
  • Accommodation Cost per Expert per Day (USD): The accommodation costs for each expert per day.

Once all fields are filled out, click on the “Calculate” button to get the estimated total cost.

Calculation Explanation:

The calculator computes the total cost based on several factors:

  • First, it calculates the total work hours as number of days * hours per day.
  • Then, it multiplies the total work hours by the hourly rate.
  • Next, it adds the transport cost per expert.
  • Finally, it calculates the accommodation cost as accommodation cost per day * number of days and adds it to the total.

The resulting sum represents the total cost of hiring the experts.

Limitations:

Please note the following limitations:

  • The hourly rate must be a positive number.
  • Transport and accommodation costs should be non-negative.
  • Number of experts, days, and hours per day should be positive integers.

Use Cases for This Calculator

Calculate Labor Costs

Enter the number of workers needed, their hourly rate, and the estimated duration of the project to calculate the labor costs accurately. Ensure to provide all necessary details to get a precise estimate of the expenses.

Estimate Material Costs

Input the type and quantity of materials required along with their unit prices to estimate the total material costs for the project. Be specific in listing the materials and quantities needed for accurate estimation.

Compute Equipment Costs

Specify the equipment needed for the project, including their rental rates and duration of use, to calculate the equipment costs. Make sure to include all relevant details to get a comprehensive cost evaluation.

Factor in Overhead Expenses

Account for overhead expenses such as utilities, insurance, and administrative costs by inputting the estimated amounts to get a complete project cost estimation. Consider all overhead costs to ensure they are covered in the budget.

Include Contingency Funds

Add a percentage of the total project cost as contingency funds to account for unforeseen expenses or scope changes during the project. Providing a buffer ensures that you are prepared for unexpected costs.

Calculate Total Project Cost

Sum up the labor costs, material costs, equipment costs, overhead expenses, and contingency funds to calculate the total project cost accurately. Ensure all components are included in the calculation for a comprehensive cost estimate.

Compare Estimates

Generate multiple estimates by adjusting labor, material, or equipment costs to compare different scenarios and select the most cost-effective option. Use this feature to make informed decisions based on various cost projections.

Save and Export Estimates

Save your estimates for future reference or export them in different formats to share with clients, team members, or to keep a record of your project cost breakdowns. Have the flexibility to store or share your estimates as needed.

Print Detailed Cost Breakdown

Print a detailed cost breakdown that includes labor, material, equipment, overhead, and contingency costs for your records or presentations. Get a comprehensive overview of the project expenses in a printable format.

Dynamic Cost Updates

Experience real-time updates as you adjust labor, material, or equipment values, instantly seeing the impact on the total project cost. Enjoy the convenience of dynamic calculations for quick cost analysis and decision-making.